Ranger Double Step - Electric 12V, 550 Wide
Ranger Double Step - 12V Electric, 550 Wide
The Ranger electric aluminium step has been rigorously tested and can withstand up to 200kg. The step is opened and closed with a 12V wall switch.
Features:
Electric 12V
Includes switch
Ribbed aluminium for extra grip
Weight capacity: 200kg
Motor drive shaft engages at both sides of step for smoother action
Specifications:
Voltage: 12-14V
Rated Current: 3.2A
Dimensions open (mm): 552W x 827D x 378H
Dimensions closed (mm): 552W x 435D x 209H
Step plate width: approx 500mm
Step plate depth:approx 200mm
Top Step plate open height: 180mm below the mounting point
Bottom Step open height: approx 360 below mounting point
Please note: Step does not include the LED light as seen in images
FOR ORDERS UNDER $399 VALUE:
Urban Delivery $9.90
Rural Delivery $14.90
FOR ORDERS OVER $399 VALUE: Free Delivery *
* We reserve the right to revise the free delivery offer on some bulky items (for example, a large fridge travelling to Te Anau). In this case, we will endeavor to offer a subsidized freight cost. If the delivery address is outside the North and South Islands (eg. Waiheke, Great Barrier, Stewart Islands), please contact us for a freight quote.
WE ONLY SEND ORDERS WITHIN NEW ZEALAND. If the delivery address is outside the North or South Islands (eg. Waiheke, Great Barrier, Stewart Islands), please contact us for a freight quote. Our automated online freight pricing only applies to North & South Island locations.
DELIVERY TIMES Due to the current outbreak, we are experience some disruptions to our normal service. Order dispatch and delivery times are being impacted by workforce sickness and isolation requirements for staff throughout our team and our supply chain. Although we use many courier options, the below NZ Couriers Network Status will give a good indication which regions are experiencing significant freight delays
https://www.nzcouriers.co.nz/network-status/
As a general rule, please allow an additional 3 working days for the below estimates (which may be extended by factors outside our control).
North Island (2-4 working days)
North Island Rural (3-5 working days)
South Island (2-5 working days)
South Island Rural (3-6 working days)