Happy holidays! We're closed for Xmas break. Orders will be processed when we re-open on the 6th January.

75mm Y Piece Reducing to 60mm Branches

75mm reducing Y Piece

$56.00
Product out of stock but available for pre order. Due January
Product Code
RV350

Universal Ducting Y Reducer 

Universal Y adaptor for reducing 75mm pipe down to 60mm ducting.

Features: 

PA6 plastic

Specifications:

Dimensions (mm): 80-65-65

Please note: The maximum length of air ducting pipe using this adaptor is 2 meters. Using more than 2 meters of air ducting pipe will drastically drop heater efficiency

Write Your Own Review
You're reviewing:75mm Y Piece Reducing to 60mm Branches
Your Rating

FOR ORDERS UNDER $399 VALUE:

     Urban Delivery $9.90
     Rural Delivery $14.90

FOR ORDERS OVER $399 VALUE: Free Delivery *

* We reserve the right to revise the free delivery offer on some bulky items (for example, a large fridge travelling to Te Anau). In this case, we will endeavor to offer a subsidized freight cost. If the delivery address is outside the North and South Islands (eg. Waiheke, Great Barrier, Stewart Islands), please contact us for a freight quote.

WE ONLY SEND ORDERS WITHIN NEW ZEALAND. If the delivery address is outside the North or South Islands (eg. Waiheke, Great Barrier, Stewart Islands), please contact us for a freight quote. Our automated online freight pricing only applies to North & South Island locations.

DELIVERY TIMES  Due to the current outbreak, we are experience some disruptions to our normal service. Order dispatch and delivery times are being impacted by workforce sickness and isolation requirements for staff throughout our team and our supply chain. Although we use many courier options, the below NZ Couriers Network Status will give a good indication which regions are experiencing significant freight delays

https://www.nzcouriers.co.nz/network-status/

As a general rule, please allow an additional 3 working days for the below estimates (which may be extended by factors outside our control).

     North Island (2-4 working days)
     North Island Rural (3-5 working days)
     South Island (2-5 working days)
     South Island Rural (3-6 working days)